Automotive Dashboard Components - ABS Production Excellence | CoreLMould
Automotive •

Automotive Dashboard Components - ABS Production Excellence

PPAP approved ABS parts for major OEM with 100% on-time delivery over 5 years.

Major Automotive OEM
Delivered 5M+ parts over 5 years with 100% on-time delivery, zero quality escapes, and continuous cost improvement.
Automotive Dashboard Components - ABS Production Excellence

Project Overview

A major automotive OEM required high-volume production of ABS dashboard components. The project demanded IATF 16949 certification, PPAP approval, and consistent quality for long-term production.

Challenge

The primary challenges included:

  • IATF Certification: IATF 16949 automotive quality system
  • PPAP Approval: Production Part Approval Process Level 3
  • High Volume: 1M+ units annual production
  • Consistent Quality: Zero defects for automotive assembly line
  • Long-Term Supply: 5+ year production program

Solution

Our engineering team developed a comprehensive solution:

Quality Systems

  • IATF 16949 certified manufacturing processes
  • PPAP Level 3 documentation package
  • SPC on all critical dimensions
  • Layered process audits

Production Excellence

  • Dedicated production cell for automotive parts
  • Automated quality inspection
  • Quick mold change for production flexibility
  • Packaging optimized for automotive assembly

Continuous Improvement

  • Annual cost reduction initiatives
  • Quality improvement projects
  • Process optimization
  • Customer collaboration

Results

Metric Target Achieved
Program Duration 3 years 5+ years
On-Time Delivery 98% 100%
Quality Escapes <50 PPM 0 PPM
Total Volume 3M units 5M+ units
Cost Reduction 10%/year 15%/year

Customer Testimonial

“CoreLMould has been a reliable partner for 5+ years. 100% on-time delivery, zero quality issues, and continuous cost improvement. True automotive manufacturing excellence.”

  • Procurement Director, Major Automotive OEM

Client

Major Automotive OEM

Industry

Automotive

Result

Delivered 5M+ parts over 5 years with 100% on-time delivery, zero quality escapes, and continuous cost improvement.

Ready to Start Your Project?

Let us help you bring your product idea to life with professional injection molding services.