Automotive Dashboard Components - High-Volume Production | CoreLMould
Automotive •

Automotive Dashboard Components - High-Volume Production

Complete automotive dashboard components for major OEM with tight tolerances and high-volume requirements.

Major Automotive OEM
Achieved 99.7% first-pass yield, zero defects in first year of production, and 20% cost reduction through process optimization.
Automotive Dashboard Components - High-Volume Production

Project Overview

A major automotive OEM approached CoreLMould for high-volume production of complex dashboard components for a new vehicle platform. The project required exceptional precision, surface finish quality, and documented manufacturing processes.

Challenge

The primary challenges included:

  • Tight Tolerances: ±0.05mm dimensional requirements for structural components
  • Class A Surface: Flawless interior visible surfaces requiring SPI A-2 polish
  • High Volume: 500,000 units annually with zero quality compromise
  • Automotive Compliance: Full PPAP documentation and IATF 16949 requirements
  • Material Specifications: UV-stabilized ABS/PPC blends meeting automotive interior standards

Solution

Our engineering team developed a comprehensive solution:

Mold Design

  • Hardened steel molds (H13) with hot runner systems for optimal gate placement
  • 8-cavity family mold design for production efficiency
  • Integrated cooling channel optimization reducing cycle time to 45 seconds
  • SPI A-2 polish on all Class A surfaces with texture matching

Process Engineering

  • SPC implementation across all critical dimensions (Cpk �?.33)
  • In-process inspection stations at every cavity
  • Automated visual inspection system for surface defects
  • Material traceability from raw material to finished part

Quality Assurance

  • Full PPAP documentation package (PFMEA, control plans, MSA, process studies)
  • CMM verification protocol for critical dimensions
  • Inbound material verification against certificates of analysis
  • Final inspection with automated optical measurement

Results

The project exceeded all targets:

Metric Target Achieved
First-Pass Yield 98% 99.7%
Cycle Time 50 seconds 45 seconds
Dimensional Cpk �?.33 1.56
Customer Escapes <100 PPM 0 PPM
Cost Reduction Baseline 20%

Key Success Factors

  1. Early Supplier Involvement: DFM analysis during design phase identified 12 potential issues before tooling
  2. Robust Process Control: Real-time SPC monitoring with immediate feedback loops
  3. Continuous Improvement: Monthly process audits and capability studies
  4. Strong Documentation: Complete audit trail from raw material to delivery

Customer Testimonial

“CoreLMould demonstrated exceptional professionalism and technical expertise. Their PPAP documentation was comprehensive, and the production ramp-up was seamless. The quality consistency over 500,000 units speaks for itself.”

  • Quality Director, Major Automotive OEM

Client

Major Automotive OEM

Industry

Automotive

Result

Achieved 99.7% first-pass yield, zero defects in first year of production, and 20% cost reduction through process optimization.

Ready to Start Your Project?

Let us help you bring your product idea to life with professional injection molding services.

Customize your cookie preferences. Essential cookies are always enabled for the website to function properly.